Client: Client | Location: Location | Duration: XX months | Scope: Cable pulling, termination, panels, tray, testing
The brief: The client needed a complete LV distribution system for a multi-storey commercial building, delivered in step with a tight construction programme.
What we did: Our team installed cable tray and ladder across risers and floors, pulled and terminated power cables, installed main and sub-main panels, and carried out full testing and commissioning.
Challenges: Congested risers and overlapping trades required careful planning and daily coordination.
Result: The system was energised on schedule, with all test reports handed over and accepted by the consultant.
Discuss this requirementClient: Client | Location: Location | Duration: XX weeks | Scope: Panel installation, cable tray, glanding and termination
The brief: A large warehouse needed reliable power distribution for lighting, racking systems and loading-bay equipment.
What we did: We installed distribution panels, long runs of heavy-duty cable tray, and terminated all power cables with proper glands and lugs.
Result: A tidy, durable installation ready for heavy daily use, completed ahead of the client's operational start date.
Discuss this requirementClient: Client | Location: Location | Duration: XX weeks | Scope: Fire alarm cable laying, containment, fire-stopping, testing
The brief: A hospital extension needed a dependable fire alarm cabling network, installed with minimal disturbance to a working healthcare environment.
What we did: We installed fire-rated cables in dedicated containment, sealed all compartment penetrations, labelled every loop and tested each circuit before handover to the alarm supplier.
Result: A clean installation with zero rework requests and full documentation for authority inspection.
Discuss this requirementClient: Client | Location: Location | Duration: XX weeks | Scope: Emergency cable laying, testing, documentation
The brief: A hotel required emergency lighting and exit sign circuits across guest floors, corridors and back-of-house areas.
What we did: Our crews laid protected emergency circuits, marked all cables clearly and coordinated functional and duration testing with the system supplier.
Result: An approved life-safety installation completed without disrupting hotel operations.
Discuss this requirementClient: Client | Location: Location | Duration: XX weeks | Scope: BMS panels, field cabling, sensors, loop testing
The brief: An office complex wanted centralised control over HVAC, lighting and energy metering.
What we did: We installed BMS panels and controllers, pulled field and network cabling, mounted sensors and actuators, and completed point-to-point testing.
Result: A clean handover to the BMS integrator, with accurate point schedules and quick software commissioning.
Discuss this requirementClient: Client | Location: Location | Duration: XX weeks | Scope: Cat6A, fibre backbone, racks, patch panels, certification
The brief: A growing company needed a new network backbone and floor cabling for its headquarters.
What we did: We installed Cat6A horizontal cabling, a fibre backbone between comms rooms, racks and patch panels, and certified every link.
Result: A tidy, future-ready network with complete test documentation.